A-tasks

PriorityItemTelClassWhoNotes
AMirror actuator air leaksBothHWMech Tech & Tel EngWork starting this week (6/20/04); this is a continuing project that will last a long time
AGuider cameras; need spares on-siteBothHWSBS techIn progress; HW shipped to OCIW for work by Estrada (6/04; Jorge is working on boards sent back from LCO
AM1 coolant mixing valvesBothHWSBS Mech Eng, Mech tech, Tel Eng work in progress (6/30/04); Charlie wants pressure measurements before and after the valve (11/03/04); No way to get pressures; Deadline is Mar 2005 (11/10/04); mixing valve carried by Charlie and installed in Feb; still noisy; FP will call CH
AConnect shop air to instrumentsBothHWMech Tech & Tel EngIn progress (6/30/04); dryer installed on compressor but more tests needed to check on humidity and ice problems (8/11/04); on hold while compressor problems being researched (4/7/05)
AM2 M3 Baffles (MagIC)ClayHWSBS Mech Eng, Tel Eng, Mag MgrPromoted 1/21/04; Charlie supplied sizes to AU; AU will review and send dimensions for M3 fitting August 2004; M3 baffle will be installed in Nov 2004, with D. Osip taking flats before and after installation (11/10/04)
AIMACS commissioningBaadeHWDressler et al., Inst Sci, Tel Op, Tel EngJan & Feb 2005 scheduled for commissioning; Zemax modeling needed (4/7/05)
AMirror support PC boards (new SOML)BothHWSBS Elec Eng, Tel Eng, Mech TechPromoted 1/21/04; SOML busy with LBT; not critical; Bagish will work on this (8/11/04); Prototype boards ready for fab (11/6/04)
AM3 turrent geometry & telescope collimationBothSWCharlie? LCO tech (Jose?)Algorithm for driving mirror to a particular position given the motor and sensor positions; LVDTs are noisy and also not in-line with actuators so the geometry is tricky (4/7/05)
ARotator guidingBothHW/SWTel Eng, LCO Mgr, CompWill do as engineering time becomes available; Jose needs to tune rotator motors (4/7/05)
ASolve rotator handshaking problemsBothHW/SWElec tech, LCO programmerAU will find Adam module replacement (handshaking problem)
ALightning protection on serial linesBothHW/SWElec techAdded 4/7/05

Other tasks

PriorityItemTelClassWhoNotes
BADC controlBaadeHWSBS Mech Eng, Tel Eng, Comp, Mech TechPromoted 3/2/04; Installed and first tested 5/9/04; Lab tests on motor torque in progress (Leroy 6/30/04); on hold for IMACS; demoted to B (4/7/05)
BM3 turrent on ClayClayHW/SWSBS Mech Eng, Tel Eng, Mech Tech, Elec Tech, CompNew detent procedure with Galil amps to be tried this week (6/30/04); working but not fully testing (8/11/04); Detents will be tested in Nov 2004 engineering time but these are considered done (11/10/04); Detent problem to be fixed by Charlie (4/7/05); demoted to B (4/7/05)
BIodine cell actuatorClayHW/SWMech Tech, Tel Eng, Inst SciIMS modules out for repair; air-shipped October 2004; installation during Nov 2004 engineering time; Demoted to B (4/7/05)
BRemote quartz halogen lampsBothHW--
BGuider mechanicalsBothHWMag Mgr, SBS Mech EngAU will initiate guider requirements discussions; FourStar will want a new guider (8/11/04); demoted from A (11/10/04)
BFlat field screensBothHW--
BReplace Glentek amps on rotatorsBothHW/SWMech Tech, Elec Tech, Tel EngPromoted 3/2/04; AU will find Adam module replacement for handshaking problem; 6/30/04; IMACS will get next setup (8/11/04); Worst problems solved, get final parts list and build the lot (11/10/04)
BEDS toolsBothSWMag MgrAU has started work on this (6/30/04)
BADC dispersion test planBaadeOBSAU will think about this-
BBaffling for IMACS imagingBaadeHW--
BData PC rack & connections, equip roomBothHW--
BCass RotatorClayHW--
B#8 dome truckBaadeHW-Demoted 1/21/04
BLift automated controlsBothHW--
BFire suppression on lift hydraulicsBothHW--
BM3 TurrentBaadeHW--
BESTOP display panelBothHW/SW--
BADC Control SW (task list from Charlie)BaadeSW--
BM2 tip-tiltBothSW--
BAlarm for mirror support failuresBothSW--
BError logging & trackingBothSW--
BLockpin interlocks everywhereBothSW--
BIMACS slitmask .nc file errorsBaadeSW--
BNon-sidereal & MIRAC trackingBothSW--
BVideo switch controlBothSW--
BTie down video monitors in control roomBothHW--
CCryotiger recharge kit: make it workBothHW--
CAZ oil system coversBothHW--
CDome aluminum tapeBothHW--
CFixed floor rotating sealBothHW--
CFP3BaadeHW--
CFP2BaadeHW--
CLouver sealsBothHW--
CLDSSThermalClayHW--
CM2 tip-tiltBaadeHWSBSDone on Clay
CPanic @ FP3BaadeHW--
CReplace lift access doorsBothHW--
CRotating dome sealBothHW--
CSeparate air for instrumentsBothHW--
CSmall ADC MikeClayHW--
CWindscreenBaadeHW--
CUpgrade TCS computersBothHW--
CTCS signal for big compressors statusBothHW/SW--
DClay bearing deflection (measure Baade)ClayHW-12/16/2003
DE-stop interlock IMACS rotationBaadeHW-12/16/2003
DFix/upgrade mirror coversBothHW-12/16/2003
DHVAC controlsBothHW-12/16/2003
DTCS upgrades for interlocksBothHW-12/26/2003
DRotatorsBothHW-01/13/2004
DSafety walk-throughBothHW/SW-12/16/2003
DTCS upgrades for interlocksBothSW--
DElevation drive bearing inspection and repairClayHWTel Eng, Mech TechRecent AZ drive failure prompts inspection and re-greasing. This will be done during the Nov 2004 engineering time
DDesign new mirror actuator cardBothHWAlan BagishDone

Previous meetings

Magellan engineering meetings

March 18, 2005 11 AM Pacific time

Agenda

  1. Intervention observing testing
  2. Laser cutter status
  3. March instrument engineering (see below)
  4. A-task review
  5. Next meeting


Instrument engineering detail

MIKE

LDSS3

GUIDERS

IMACS (All of this work will take place in the CCD lab in the support building. We would like the dewar to be warmed up in time to start working on it on March 24.)